亚洲免费人人妻人人,cao78在线视频,福建一级毛片,91精品视频免费观看,高清另类图片操逼,日本特黄特色大片免费看,超碰欧美人人澡曰曰澡夜夜泛

Study on slope reliability method Re

時間:2023-04-28 08:57:05 天文地理論文 我要投稿
  • 相關(guān)推薦

Study on slope reliability method Response Surface Method based on Morgenstern-Price Method

The combination of Morgenstern-Price Method (MPM) with Response Surface Method (RSM) improves the conventional RSM by replacing Finite-Element Method (FEM) with MPM, which is a type of reliability analysis method- -RSM based on MPM, and makes the computing process simpler. The stability of the slope was re-evaluated by use of Monte Carlo method (MCM) and the result contrasted with the fore is the conclusion. The reliability analysis of the artificial slope in Donggang Power Station was carried on, and obtained the reliable characteristics, which provided basis for the project.

作 者:   作者單位:   刊 名: 世界地質(zhì)(英文版)  英文刊名: GLOBAL GEOLOGY  年,卷(期): 2009 12(3)  分類號: P5  關(guān)鍵詞: slope   Morgenstern-Price Method   response surface   reliability index   Monte Carlo Method  

【Study on slope reliability method Re】相關(guān)文章:

My English Study06-09

《Do-re-mi》教案10-20

Eigenvector Method for Ranking Alternatives with Vague Value Measurements04-27

Knowledge Fusion Design Method: Satellite Module Layout04-26

A stochastic method for convective storm identification,tracking and nowcasting04-26

Adjoint method for the optimum planning of industrial pollutant sources04-26

Static Force Reliability Analysis of Truss Structure with Piezoelectric Patches Affixed to Its Surface04-26

Recent Study of the Changjiang Fault Zone04-27

My study作文(精選20篇)12-06

My English study英語作文05-26